收費島形狀是根據(jù)目前用于高速公路進出口的島頭島端和中間底座部件制成的
收費島鋼模一般采用現(xiàn)場澆鑄技術(shù)以減少次數(shù) 裝卸費用 收費島型鋼型
材基礎(chǔ)知識型材規(guī)格一般為4米長主體結(jié)構(gòu)為三部分所以型材為組合型可
提供一般現(xiàn)場成型的方便 鋼板厚度為4mm加強筋為5mm重復(fù)使用時不變形
收費島模具應(yīng)按圖紙制作相鄰鋼板絞合在一起以增加立柱強度和穩(wěn)定性軸
的放置應(yīng)提前完成 在地質(zhì)任務(wù)中大地測量非常重要可以使施工更加方便
收費島模具必須用脫模劑進行預(yù)處理然后安裝 該鋼量規(guī)應(yīng)提供干凈水平和
堅固的地板表面 同時澆注時必須安全可靠 這種類型的表格被傳輸 需要
注意的是不同規(guī)格的鋼模具不能混用因為它們零件的性能和尺寸也不同
收費島模具現(xiàn)場組裝固定完成后工人在其中涂抹機油加以保護隨后放入管道
進行混凝土的注入工作經(jīng)過多道工序的操作混凝土會慢慢凝固成型這樣收
費島完成了澆注工作由此可見各類模具的作用無非就是用來對混凝土水泥等
砂漿完成塑形工作本身流動性超強的砂漿凝固就是一件難事而使用鋼材質(zhì)模
具進行幫助的話大部分的模具都是鋼板生產(chǎn)并不會有著變形問題可以放心操
作
The shape of toll island is made according to the island head, island
end and middle base components currently used for Expressway import and
export. The steel formwork of toll Island generally adopts in-situ
casting technology to reduce the number of times. Handling charges.
Basic knowledge of profile steel of toll Island: the profile
specification is generally 4m long, and the main structure is three
parts, so the profile is combined, which can provide the convenience of
general on-site forming; The thickness of the steel plate is 4mm and
the stiffener is 5mm. It will not deform when reused. The toll Island
mould shall be made according to the drawing, and the adjacent steel
plates shall be twisted together to increase the strength and stability
of the column. The shaft shall be placed in advance; In geological
tasks, geodesy is very important, which can make construction more
convenient. The toll Island mold must be pretreated with release agent
and then installed. The steel gauge shall provide a clean, level and
firm floor surface. At the same time, the pouring must be safe and
reliable. This type of table is transferred. It should be noted that
steel molds of different specifications cannot be mixed because their
parts have different properties and sizes.
After the toll Island mold is
assembled and fixed on site, the workers apply engine oil to protect
it, and then put it into the pipeline for concrete injection. After
multiple processes, the concrete will slowly solidify and form, so that
the pouring of the toll island is completed. It can be seen that the
function of all kinds of molds is nothing more than to complete the
molding of concrete, cement and other mortar. It is difficult to
solidify the mortar with strong fluidity. If steel molds are used for
help, most molds are produced by steel plates and will not have
deformation problems, so they can be operated safely.